Headingley, Leeds

A rewire before the renovation

A full rewire and a new consumer unit, timed around the plasterer.

Sample project with illustrative photography. Not a completed customer job.

A room stripped back to bare plaster with a cable hanging from the ceiling

The brief

What the owners wanted.

A Victorian terrace had been bought for renovation. The wiring was old, there were two sockets in most rooms and the fuse box still used rewireable fuses.

The owners wanted the electrics done once, properly, before the plasterer and decorator arrived.

Approach

How the work would run.

  1. Step 1: Survey and plan

    The existing installation was inspected and a room-by-room plan agreed before any work started.

  2. Step 2: Work in stages

    Floors were rewired one at a time, with temporary power kept in the rooms in use.

  3. Step 3: First fix before plaster

    Cables and back boxes were in and checked before the plasterer's start date.

  4. Step 4: Second fix and handover

    Accessories and the new consumer unit were fitted, every circuit tested and the paperwork handed over.

Photos

A closer look.

Illustrative stock photography chosen to show the finish this kind of job aims for.

Planning something similar?

Let’s switch
things up.

Tell us what you're planning.

Request a quote Call us

Demo website

There's no phone line behind this button

Switchform is a fictional business, so there is no number to call. On a live site this button would ring the business directly from a phone. You can still try the enquiry form to see how a quote request works; nothing is sent.